The MCBs needs to be clipped onto the Din bar as well as the busbar right into a present-day flowing terminal and tight screwed to present existing towards the MCBs.Two sixteen/25mm tail cables, one neutral and the other active are connected to the main double pole switch with the meter. The main earth cable needs to be screwed into your earth bloc